Thermalito Pumping-Generating Plant
Located about four miles west of the city of Oroville in Butte County, Thermalto Pumping-Generating Plant is a principal feature of the Oroville-Thermalito pumped-storage power complex. A pumping-generating plant, the facility is operated in tandem with Hyatt Powerplant and Thermalito Diversion Dam Powerplant to produce power. Water released for power in excess of local and downstream requirements is conserved by pumpback operation during off-peak hours through both power plants into Lake Oroville. The water is subsequently released for power generation during periods of peak power demand. Construction on the plant began in 1964 and was completed in 1969, with operations starting in 1968.
Ronald B. Robie Thermalito Pumping-Generating Plant
Ronald B. Robie Thermalito Powerplant is a principal feature of the Oroville-Thermalito pumped storage power complex. The facility is operated in tandem with Hyatt Powerplant and Thermalito Diversion Dam Powerplant to produce power. Water released for power in excess of local and downstream requirements is conserved by pumpback operation during off-peak hours through both powerplants into Lake Oroville to be subsequently released for power generation during periods of peak power demand. Construction on the plant began in 1964 and was completed in 1969, with operations starting in 1968.
Thermalito Diversion Dam Powerplant
Thermalito Diversion Dam Powerplant is located at Thermalito Diversion Dam below the left abutment of the dam. It was constructed between 1985 and 1987 and generates electricity from water released to the Feather River to maintain fish habitat between the Diversion Dam and Thermalito Afterbay river outlet. The plant facilities consist of intake headworks, inlet pipes, a single penstock, an underground powerhouse with one turbine unit, a tailrace channel and outlet works.
Edward Hyatt Powerplant
Located in the rock in the left abutment near the axis of Oroville Dam, Edward Hyatt Powerplant is an underground, hydroelectric, pumping-generating facility. Construction of the plant began in 1964 and was completed in 1967. Hyatt Powerplant maximizes power production through pumped storage operation where water, released for power in excess of local and downstream requirements, is returned to storage in Lake Oroville during off-peak periods and is used for generation during peak power demands. Water from the lake is conveyed to the units through penstocks and branch lines. After passing through the units, water is discharged through the draft tubes to one free surface and one full-flow tailrace tunnel.